Harsha Lake Dam Right Abutment Gutter Repairs
PROJECT OWNER: US Army Corps of Engineers
LOCATION: CINCINNATI, OH
BUDGET: $ 664,000
COMPLETION: 2021
Cornerstone was awarded this contract in 2020. The work consisted of the removal of the existing concrete drainage ditch that ran down back side on the east side of the dam. The slope was regraded and articulated concrete vegetative matts were installed to help alleviate the erosion along the ditch line. The discharge into the tail water was also reworked and new rip rap was installed at the slope.